UPDATE: As of July 26th, 2013 the doors have had final adjustments and equipment is now stored in the new building. Congratulations to the members and board for this great accomplishment! See the slide show for construction photos.
The membership voted at the annual meeting February 4, 2013 to proceed with the Board's recommendation for the construction of a 40 X 60 cold storage building. The pole structure will have two 12 X 16 doors, and a walk through door. The structure will start out as a shell with a gravel floor, with the option of adding concrete, insulation, and heat as funds and the will of the membership dictates.
Conceptual views of the structure, and it's location with respect to the other buildings on site can be seen below.